Reform of portal, eliminating stairs of main access and realizing a ramp with non-slip finish and railing on one side for easy accessibility. Integration in the wall with the same material Marble Crema Ivory from the water meters.
Refurbishment of stairways to rise in pink Porriño granite material, with all the finishing of steps and skirts.